Paving the Way – Phase 2 and HyRAP Streets Project
Location Various Locations City or County Responsible for Project City of Montebello Category Roads: Efficient and Sustainable Road Maintenance, Construction and Reconstruction Projects. Author René Bobadilla, P.E. Organization City of Montebello Address 1600 West Beverly Boulevard, Montebello, CA 90640-3932 Phone (323) 887-1350 Project Description MONTEBELLO – BRINGING SUSTAINABLE STREETS TO OUR RESIDENTS Cities throughout Southern California struggle with aging streets, limited budgets and looming environmental mandates. Montebello recently confronted those challenges with two innovative street projects, repaving nearly 100 streets. Montebello became the first California city to use the advanced Composite Layering System process, HyRAP® Hot Mix Asphalt (HyRAP®) on an Asphalt-Rubber Aggregate Membrane (ARAM), referred to as HyRAM™. Conventional hot mix asphalt is a combination of virgin aggregate and liquid asphalt (oil), whereas HyRAP® is produced almost entirely using recycled asphalt and petroleum rejuvenators, therefore resulting in a reduction of 100% of virgin aggregate and up to 90% in […]